Comparision with Other Option

Comparision with Traditional Toilet
Comparision Selan Eco fast toilet Pre-Stressed Concrete Traditional Toilet By Construction
Material Consistent Quality with smallest size of section. Consistent Quality of Material not Possible
Strength Provides Best Strength with smaller and thinner sections. Strength may vary from place to place and material to material and depend upon workmanship
Execution Time Very less time required for execution (60 Min.). Time required for execution is 4 Man Days
Skilled Labour Only 2 unskilled labour required. More no of Skilled/ unskilled labour required.
Technical Supervision No technical supervision required as elements are per checked and tested. Technical Supervision required at every stage and phase to get good work.
Maintenance Maintenance not required. Difficult to maintain and cost of maintenance is more.
Quality Best Quality. Manufactured in Factory. may vary from material to material and depend upon workmanship
Environment Friendliness Fully. Fly Ash is used for Manufacturing. Partially
Cost Most economical with respect to any other available product Total cost of toilet varies with local raw material cost.
NGO Point of View Best for NGO as easy to handle, execute with good quality. Difficulty to handle material & quality assurance.
Life Min. 10 Years. If Properly Constructed than 10 Yrs.
Comparision with PVC Pre-Fabricated Toilet
Comparision Selan Eco fast toilet Pre-Stressed Concrete PVC Toilet
Material Consistent Quality with smallest size of section. Consistent material but Brittle in Nature
Strength Provides Best Strength with smaller and thinner sections. With passage of time loses it strength. & Depend on Weather Conditions
Execution Time Very less time required for execution (60 Min.). Readymade so execution time not considered.
Skilled Labour Only 2 unskilled labour required. More unskilled required for transits of toilet.
Technical Supervision No technical supervision required as elements are per checked and tested. Technical guidance required at the side of manufacture.
Maintenance Maintenance not required. Maintenance not possible.
Quality Best Quality. Manufactured in Factory. Consistent but with more cost
Environment Friendliness Fully. Fly Ash is used for Manufacturing. Not
Cost Most economical with respect to any other available product Very High
NGO Point of View Best for NGO as easy to handle, execute with good quality. Past experiences show that toilet have not performed well.
Life Min. 10 Years. 1 to 2 Yrs., As Per Past Experience
Comparision with Concrete Pre-Cast Pre-Fabricated Toilet
Comparision Selan Eco fast toilet Pre-Stressed Concrete Concrete Pre-Cast Toilet
Material Consistent Quality with smallest size of section. Heavy Section required for same strength
Strength Provides Best Strength with smaller and thinner sections. Strength not possible in smaller and thinner section.
Execution Time Very less time required for execution (60 Min.). Time required is less than traditional but more than Selan.
Skilled Labour Only 2 unskilled labour required. More unskilled required due to heavy section.
Technical Supervision No technical supervision required as elements are per checked and tested. Technical supervision required as elements are very heavy and difficult to handle.
Maintenance Maintenance not required. Maintenance not possible.
Quality Best Quality. Manufactured in Factory. can be maintained but with very heavy section and difficult to handle.
Environment Friendliness Fully. Fly Ash is used for Manufacturing. Partially
Cost Most economical with respect to any other available product More cost as the section size is larger for similar product.
NGO Point of View Best for NGO as easy to handle, execute with good quality. Due to heavy weight difficult to handle and execute.
Life Min. 10 Years. About 5 Yrs., As Per Past Experience